John Clark Naldoza

Denver, CO (USA)
Role(s):

Hydro Dynamic Power Systems

Location: Denver
Industry: Energy
Year Founded: 2007
Number Employees: INVALID
Description: The HydroDynamic solution involves a new way to harness the power of water in such a manner that is similar to the Pump Storage Facilities presently used today, however our process utilizes a fraction of the land requirements of those facilities and is operational within months, not years. Our short-term 3 to 5 year goal is to build and operate approximately 500 “Micro Hydroelectric Power Plants” strategically situated throughout the USA with an individual power production capacity of approximately 1 Megawatt each. Once we reach a production rate of 100 Megawatts we will start construction on our second-generation facilities with individual production capacities of 50 Megawatts each. These plants while larger can still be built within a relatively short time period. The 5 to 8 year