David Brewer

Rogers, AR (USA)
Role(s):

globalenvirotec,inc.

Location: Rogers
Industry: Technology/Web
Year Founded: 2004
Number Employees: INVALID
Description: Provide the ONLY sevice for the 100% removal of bio-growth/mineral deposits utililizing NSF60 certified chemicals in the potable drinking water industry. Outide of failing infrastructure, bio-growth/mineral deposits are the biggest cost to the industry. Presently they have to over use Chlorine,(which presents another set of problems to the industry,EPA regulations, cost to produce, shortens life of equipment, downstream contaminants,etc. Present way of removal is sandblasting, reprime substrate, recoat, disposal of waste, typically 1M gallon tank with present system 2-6 months downtime. With our system 1M gallon tank, one day. Cost difference, present $300K to $700K vs. our system $8K @ 60% (URL removed)e we clean/inspect coatings, goes on our 3-5 year maintenance (URL removed) are presently tie