C Bunn

Houston, TX (USA)
Role(s):
Other

Wall Ranch Wind Farm

Location: Houston
Industry: Energy
Year Founded: 2007
Number Employees: 1-10 people
Description: Wall Ranch is seeking the final $15MM equity to combine with $80MM already secured to begin operations. Wind farm is "shovel ready"..10 months (conservatively) to power production/ load permitting. Turbines waiting. Permitting, land, grid capacity and access, wind resource, engineering studies, environmental all secured. Provisional Power Purchase Agreement in place with AA rated Untility. Site strategically located within 3 miles of a 120MW wind farm that has been producing for 2+yrs.